View Single Post
Unread 21-11-2012, 22:13   #7
longword
Regular Poster
 
Join Date: Jan 2012
Posts: 33
Default

I thought it was something to do with the overhead electrics rather than command and control. The 20:13 Pearse to Drogheda ran close to schedule, but stopping at all the DART stations. About 10 minutes late by the end of its run.

There were no platform announcements while I was at Tara, but I did overhear an onboard PA on a passing DART that mentioned an electrical problem between Connolly and Clontarf.
longword is offline   Reply With Quote