Quote:
Originally Posted by James Howard
I'm just stuck on the 0545 from Sligo at Enfield. It looks like the Maynooth - Clonsilla signalling is out yet again which is a fairly regular occurrence.
We've had an announcement from the driver full of abbreviations like C&C and S&E to the effect that this is going to cause about a 20 minute delay at Enfield but I guess we'll just wait and see.
|
C&C ? maybe CTC.
M3 Parkway services are operating normally so possibly points/track circuit failure rather than a general failure. Not much consolation if your train is stationary !