Quote:
Originally Posted by stevetee
If we're talking a general IE deferral of all timetable changes until Autumn 2010 due to the KRP then why didnt IE just say so ? If on the other hand, its a case of situation normal EXCEPT @ Monasterevin, I think MRUG are going to have to fight harder to reinstate the changes we squeezed from IE.
|
Any suggestions on maximising the possibility of the above tt changes making it into a post-KRP timetable 2010 ?
Steve