View Single Post
Unread 14-12-2009, 11:08   #7
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

The drag away solution would be to proceed to Portarlington and off load the passengers to the Dublin bound platform, train would then reverse into the up loop for later recovery

The Dublin bound platform is the best as if the train gets stranded in there its not a major problem to work trains around it, which isn't so practical in the Cork platform.

All the driver has to do is to ensure the gearbox is disengaged on all defective coaches to ensure its safe to drag. In contrast the evening commuter train suffered a uncontained engine failure near Skerries 5 year ago, with bits of the engine ejected into the countryside it managed to drag itself unaided to the next station with less than an hours delay
Mark Gleeson is offline   Reply With Quote