Victor, this may just be poor journalism and referring to the shortrunning Howth trains which was going to be the case with the turnback facility proposed but now removed from the heuston station box. I assume this facility will now be incorporated into the Inchicore works.

In terms of separate projects, internally, the Interconnector is separated from the electrification of the lines but this would be a normal procedure.