View Single Post
Unread 03-02-2009, 12:04   #14
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Quote:
Originally Posted by Mark View Post
probably be much cheaper to cover over the existing track at the vulnerable points (disclaimer - I AM an engineer!)
The actual track bed is a big problem as the sea eats away at it, a fortune has been spent on coastal defense works

Long term the only way to reduce journey times and increase capacity is a new tunnel, that needs to be looked at now, not much point looking at it when the engineers come back one day and say they have to close permanently

Rockfall -> derailment -> train 50 feet drop head first into the sea
Mark Gleeson is offline   Reply With Quote