View Single Post
Unread 21-10-2007, 00:08   #14
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Quote:
Originally Posted by al2637 View Post
As a side issue, Docklands doesn't seem set up to be able to deal with this many passengers. A 4 car train caused quite a backlog at the turnstiles with people getting in each others way and pushing trying to get through.
AFAIK Docklands has 10 turnstiles. The problem is that it is a terminating station (everyone is getting off) and the platform-turnstile distance is short (people don't get spread out like Connolly platform 5/6/7 to the main concourse). If you have a full eight car trains, they could take 10 minute to unload - by which time the next train (when they have more trains) has shown up.

I raised this at the time of the planning application but was scoffed at by CIÉ Property Department.
Colm Moore is offline   Reply With Quote