Peak hour inbound loadings are quite good, reports suggest loadings over 250 possibly over 300 on the two peak arrivals which for a 180 seat train is a good load
Docklands wasn't meant to open till December so it won't be till then the full service is rolled out there are some operational issues which will be sorted then
What capacity was released on the other trains is simply taken up by more people, there is a massive latent demand in D15, train is so massively faster than the bus.
There is one inbound 4 coach train which will be made 8 coach in the coming weeks which will add another 600 spaces to Connolly.
|