I will never rest until I see it used as part of an integrated rail plan.

Facts as things stand now.

1. It can be used for Kildare line services on Sundays. (an IE manager told me at a public meeting last year that this would confuse passengers! A division of services is currently operating on the Maynooth line. Oopps I forgot, that suits them.)

2. It could have been used to route Kildare services to Docklands. IE promised this as per the info we gave to the Irish Times. P11 is determined to get answers as to why this didn't happen.

3. New stations should be provided in the areas of Blackhorse ave, Cabra and Phisboro.

4. If the interconnector is actually built, the PPT route allows these new stations to connect with the interconnector and metro. We open up huge areas of the north city to rail transport. Commuter services from the Kildare line and beyond can be divided between interconnector and PPT. Everybody wins. Integration would be vastly improved.

5. Both the SRR, PFC and Transport 21 have ignored the vast potential of the route. P11 continue to be the only transport body that recognises the merits of using this route.

6. The key to its success (Spencer Dock) has been compromised by CIE. It can be trully said that they don't appear to give a damn about communities along the PPT line. It will continue to be a missing link and may well haunt us long after the current crop of P11 people have departed.

Personally, this piece of infrastructure continues to niggle at me and Im gobsmacked by the attitude displayed towards it. It will always be a missing link in the apparent grand plan that is T21.