Well it would be Sydney Parade Pearse if it closed

There is talk of building a floor of some class over the current concrete beams of which the overhead wires are supported during the demolition

They will have to install new supports so that could cost a weekend or two of course if it was timed with the signaling upgrade at Grand Canal Dock could result in no additional hassle

Of course the big advantage is that on match days the level crossing will be closed in the future thus saving heaps of delays