At least those are semi-accessible in comparison to the on-street track.
However, that track did seem to be in a pretty poor state. I'm supprised by the lack of drainage / pooling.
So basically, ignoring the street embedded track thats:
The entire red line
and the greenline section from just before charlemont through to beechwood, the rest of the line being ballasted track
|