![]() |
northern line train delayed this morning 17Jul06
the 06:35 from dundalk was 19 minutes late getting into Tara this morning. stopped for about 5 minutes on malahide estuary to let the enterprise past.
No announcements or anything. Think the 6:48 from Drogheda didn't run, no trian passed through R&L southbound between 7:10 and our train arived. |
The 6:35 ex Dundalk was about 20 minutes down this morning, train seemed mechanically OK, full power all engines. No report on the 6:48, if the 6:35 made extra stops then the 6:48 did not run
Everything was still in perfect order except the 7:40 ex Howth got out ahead, Still doesn't account for losing 20 minutes, the musical chairs game in Malahide is to be expected |
All times are GMT. The time now is 21:09. |
Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.