![]() |
[5-3-2007] Another brakedown
The Sligo set is out making a round trip. Coach related fault it appears
Quote:
|
saw them push a mk2 into position this morning,the best looking mk2 i've ever seen!
|
Its very well looked after and word is it will be back running 6 days a week later this month, word been going around since January
No reports of delay on the return leg again exposing the fact a 75mph train is more than able to match the 90mph enterprise That makes 4 enterprise services run by non enterprise in the last week |
I did notice the train going past us this morning as our enterprise was running late. I thought it was going to Drogheda as a commuter train :eek:
|
Also the Gatwick set worked the 16:10 ex Belfast & 19:00 ex Dublin today Thats the second time in under a week its been to Dublin.
Those brakes must really be welded on this time. Also what is it with the filler all over the DD coaches? Even the 80 Class never looked as bad as the DD coaches look at the moment. |
The 7:30 ex Dublin was replaced by a Mk2
The 10:30 ex Belfast was replaced by a Mk2 The 13:20 ex Dublin ran as a DD set The 16:10 ex Belfast ran as the NIR gatwick set The 19:00 ex Dublin ran as the NIR gatwick set Looks like they patched the train up in Dublin and sent it home for repair |
All times are GMT. The time now is 21:36. |
Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.