Just came across this, interesting to see the timescales.. Maynooth electrification only by 2015 I guess.. Connolly resignalling by 2017? It can't be that long, really?
http://pbeps.wordpress.com/2010/11/23/t21-update/ |
Thats more or less the expected program
The Malahide - Killester signalling should be in place a fair bit sooner than the presentation says its nearly finished installation The Pearse phase gives us platform 3 at Grand Canal Dock and stretches all the way to just outside Connolly Reilly's Gates on the Maynooth line is at planning stage already. You can't resignal the route until the level crossing issue is dealt with Navan is unlikely to be Q1 2011 as they are still at scoping currently, it will be early Q2 2011 |
Fair enough but it was good to see that about O'Reilly's Bridge (I live about 10 minutes from the level crossing) and even about the famed Pelletstown Station moving closer to construction hopefully..
|
Reilly's Bridge will be done by Dublin City Council. Last I heard they were doing the EIS.
|
All times are GMT. The time now is 11:11. |
Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.