[Article] Rail Against the Machine
Sunday Tribune 11/4/2010 Page 14.
Full text later by 8pm, not online yet It seems that Irish Rail 'donated' taxpayers money to put a train back in service for a single trip, but it won't use the train to fill in for the string of breakdowns. |
|
Pretty damning stuff...
|
How many articles total - two?
|
|
I wonder what line will be next for the chop to cope with the opening of the Clonsilla - M3/Pace?! :confused:
Rail against the Machine: Its a good article, highlighting a lot (but still tip of iceberg). With the KRP being "surplus to requirements" does this mean an end to the Interconnector? |
Its important to be clear that the KRP is a very important piece of infrastructure and even today is providing an improved service mainly through the much improved signaling.
KRP will only really shine with the interconnector in place. Previously IE terminated the tunnel in Heuston with no link to KRP, currently the link is proposed at Inchicore and will exploit the KRP to a level greater than originally envisaged How on earth IE expect to grow passenger numbers with a timetable which is full of strange gaps is beyond me, they need to put a clockface timetable in to provide the consistency which people need |
For reference the 8200 DART fleet is out of service due to a refusal within Irish Rail to buy the spare parts. Price is a factor but they are several vendors.
Parts are available. The 8200 fleet uses an Alstom ONIX drive system which is common in most Alstom products between 1997 and today, i.e several thousand of units. In fact some parts are directly exchangeable between the Luas fleet and the 8200's. The Alstom ONIX is recognised as being one of the best in the business. The bogies are the same as the LHB fleet and IE has several spare. |
Quote:
|
They started out very reliable with all 10 in service each morning as a matter of routine. Yes there are problems but if you ain't willing to pay for spare parts of course the train will break down.
Plenty of other railway companies bought stock from Alstom in that era and stuck it out and resolved the issues resulting in a reasonably reliable train. They stuck with it, IE gave up. |
|
Quote:
|
Shinny new stuff doesn't fix all problems
Customer service is still woeful, WRC timetable a disaster. Nothing in the article is challenged, all the numbers, Ken had it spot on. This so called charity trip will come back to haunt IE. Charity starts at home and the folks on the 15:30 to Galway last Friday would have been very happy to make the journey on a Mk3 set, much nicer than the bus they ended up on. |
Just sent to Trib Editor:
Quote:
|
A nice letter well put.
|
Quote:
|
Quote:
Also, glad to see that the comments underneath are moderated, nice to see all the old gang there |
I must apologise to everyone, the article said 24 temporary restrictions between Dublin and Cork in December 09, the number was actually 26.
|
Quote:
that is the sort of unreliability you can expect from RUI |
Still though the numbers are getting worse, not better. Accuracy is very important to us
For the record 5th December 2009 Down (towards Cork) 13 - 3@50mph 10@25mph Up (towards Dublin) 13 - 4@50mph 8@25mph 1@20mph |