June 2017 - Limerick Service Alterations
http://www.irishrail.ie/limerickworks
Quote:
|
This is a lot of disruption given that the layout is now relatively simple, the points have already been renewed and presumably wired back to a location that they can be easily connected to the new system. Are they totally renewing the track and re-building the platforms as well ?
|
Quote:
Quote:
|
This is a lot of disruption given that the layout is now relatively simple, the points have already been renewed and presumably wired back to a location that they can be easily connected to the new system. Are they totally renewing the track and re-building the platforms as well ?
|
Yes
|
Quote:
|
All times are GMT. The time now is 15:56. |
Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.