Upgrade for 1805 Connolly to Longford
This was a 22k today and last Friday. Presumably the normal train is getting fixed. Would be nice if it were to continue.
|
The 29000 that works the Longford had to work the 13.05 to Sligo as the
22K had broke down earlier that day. |
Back to the usual 29k today but it has had a really good scrub. Seems very bright as if loads of light bulbs have been replaced.
|
There is an overhaul program of some kind underway in Drogheda
|
All times are GMT. The time now is 22:59. |
Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.