JohnDough 09-05-2016 10:40

No lift in Maynooth
 
Why is there no lift facilities at a major junction like Maynooth when even minor stations have them.

It is extremely difficult for disabled passengers never mind able bodied persons to have to drag there luggage over the antiquainted bridge there.
One sometimes has to guess which side the train is leaving from.

Irish rail come on and do something about this asap.:(

Mark Gleeson 09-05-2016 10:54

A side gate with level access is provided on the other platform. This meets the minimum legal obligation. The exit also has a leap card reader

The roll out of lifts is limited by funding

Jamie2k9 09-05-2016 16:30

Quote:

The roll out of lifts is limited by funding
Not to forget local politics also dictates where they go...of course IE wouldn't admit that!

James Howard 09-05-2016 18:40

That bridge in Maynooth is a bit of a killer though. The steps are particularly steep and it seems to be about a metre higher than the older bridges further down the line.

The exit requires somebody to be awake to let a buggy or a wheelchair out. I frequently see people stuck there trying to get out while nobody is answering the intercom.

JohnDough 04-05-2019 20:55

This is totally unacceptable these days perhaps we should be lobbying our politicians to do something about this.
As for the funding excuse why are double length trains being used with virtually no passengers on off peak times typically Saturdays and Sundays wasting valuable resources and also train engines left running for hours on end particularly at Connolly /Heuston not to mention the pollution that it causes and damage to people's health.
Irish Rail management need to up their game and use their finances more wisely.

seamus kilcock 07-08-2019 19:46

"A side gate with level access is provided on the other platform. This meets the minimum legal obligation. The exit also has a leap card reader

The roll out of lifts is limited by funding"

Your statement Mark may indeed meet the 'minimum legal obligation' but, certainly does not meet the 'minimum expectation' for 2019.

Mark Gleeson 11-08-2019 04:28

Policy has moved away from lifts in favour of ramps. Ramps don't break down.

The railway works order on Maynooth line upgrade is due soon and this will cover a multitude of works.

Once the minimum requirement is provided its impossible to push for more when there are many stations which don't meet even the most basic standards.

Jamie2k9 11-08-2019 13:03

Are breakdowns caused primarily by vandalism or mechanical?

If vandalism it suggest IE not taking any criminal action because its hard to see mechanical issue causing such problems. Offices, apartments blocks, public buildings rarely encounter problems would be heavily used compared to stations.

Moving towards ramps is terrible, ramps in Nass/Kildare are not great plus many elderly people would pick lifts over ramp/steps while many in wheelchair would probably do the same.

Mark Gleeson 15-08-2019 07:31

Vandalism is the main cause. Howth Junction was a huge problem

Each lift now has a camera watching each door, if the request button is pressed the lift will not respond until a CCTV operator approves. Lift breakdowns reduced to a fraction of previous levels.

Much of the equipment is now 15 years old, some 20 years old. Parts are a challenge, most of the lifts are exposed to the elements also

Ramps don't breakdown, do not require maintenance and do not attract anti social behavior

Jamie2k9 19-08-2019 11:04

Quote:

Originally Posted by Mark Gleeson (Post 80035)
Vandalism is the main cause. Howth Junction was a huge problem

Each lift now has a camera watching each door, if the request button is pressed the lift will not respond until a CCTV operator approves. Lift breakdowns reduced to a fraction of previous levels.

Much of the equipment is now 15 years old, some 20 years old. Parts are a challenge, most of the lifts are exposed to the elements also

Ramps don't breakdown, do not require maintenance and do not attract anti social behavior

interesting they have the CCTV operating approving access. Wonder if Luas operate such a system?

It's still short sited if they were to scrap lifts for ramps. Lift replacement appears is needed gradually instead of wasting time going after spare parts at stations with heavy usage.