Quote:
|
There is a very large number of apartments in the area around that proposed station (a bridge is included) so it has good catchment. Its too far to walk to both Ashtown and Broombridge as it stands
Folks need to realise the Luas to Broombridge is going to radically shift the fortunes of the Maynooth line particularly for Dunboyne passengers as in the time it currently takes to get to Pearse you would be in Stephen's Green by Luas if you changed Also provides a handy backup if Connolly is closed/blocked for any reason |
Quote:
Bear in mind that these people currently pay only the rail fare. |
Leap card will deal with that problem in part, journey to Broombridge only will likely be cheaper than going to Connolly plus Leap will soon offer transfer rebates so the fare on the second and subsequent leg of the journey will be discounted.
The Luas will open up an new route so will attract new passengers The very long term goal is to remove any kind of operator specific fares, so moving towards something like Berlin, 1 ticket valid on operators. It will probably take decades to actual do. |
Quote:
|
I suppose it is about giving people choice and adding resilience to the system.
For someone going beyond St. Stephen's Green, not having to walk Pearse-SSG will be useful. |
Quote:
|
Quote:
|
Quote:
Be interesting if the Pelletstown Station ever comes off... Like where is the cash for this... |
Quote:
The losers are the existing passengers from further out, who get another delay. Having removed Reilly's level crossing and removed the delays that constantly come from that, it's replaced with a station stop. Electrification would solve these issues, and then more stops could be added, like between Drumcondra and Connolly. Let's hope that happens before the station is built. |
Continually adding stations on double track infrastructure means either comparatively infrequent services or impractically slow longer distance services. Neither market can be served effectively. This approach on the Bray/Greystones/Wexford line means that traffic on the line beyond Greystones has virtually collapsed as it is generally much quicker to drive and cheaper and no slower by bus.
While electrification might help, it is disruptive to install and massively disruptive in the event of overhead line problems. The recent performance of the DART systems suggests that electrification is no panacea and may not in fact deliver worthwhile journey time savings. |
This has been appealed to An Bord Pleanála.
|
There you go, scrapped.
This will never come off, there cannot be the capital available for such a project.. |
Capital is no problem, NTA is paying
The appeal may be thrown out on a technicality. |
Is there an envisaged construction start date???
|
Quote:
|
Appreciate that alright, but just was wondering if there was a timetable in place now that planning was approved - bar the appeal of course
|
Pelletstown train station- planning update
Here's an update on the planning permission for the Pelletstown train station-
http://www.davidrouse.com/index.php/...-planning-news |
Pelletstown train station- new update
Here's some new information about the progress of planning for the train station at Pelletstown/Royal Canal Park-
http://www.davidrouse.com/index.php/...station-update |
Pelletstown station update
The station proposal was with An Bord Pleanála for determination as to whether it was Strategic Infrastructure Development.
That process has concluded (see http://www.pleanala.ie/casenum/PC0182.htm) and the original planning appeal is now being considered. On a related local development, the new overbridge at Reilly's level crossing (XG002) is due to be lifted into place in the coming weeks. |